Aftermarket parts FULL WERK tractor pto drive shaft potato planter machine for agriculture
Specification, Features and product advantages OFPTO Drive Shaft—FULL WERK:
Specifications
1. All parts are forged.
2. Sample welcome3. LOW MOQ
Features:
1.Model Number/Cross Series:
T01,T02,T03,T04,T05,T06,T07,T08 and some special cross Journal
2. Dimension/Size:
Minimum overall length: 600-1800mm or 27"-60"
3. Working Condition:
For Tractors, Trucks and Agricultural Use
4. Shield Colour:
Yellow or black
5. Material:
Steel and Plastic
6. Tube:
Triangular, Lemon, Star and Splined
7. Apply
Tractor, Rotary Cultivator, Planter Machine,Farmandetc.
8. Certificate
CECertificate
Product advantages:
1.All parts are forged.
2.Use vertical broacher machine,this willproduce good centric degree.
3.Plastic cover can work normally between -35 °C to 80 °C .
4.All torque limiter are torque set ready before transportation.
5.The highest power transmission can reach 200HP (series 48).
Pto Drive Shaft Item:
PTO shaft structure:
Other relevant parts for cars or machinery we have made in our workshop are as follows:Drive shaft parts and assemblies,Universal joint parts and assemblies,PTO drive shafts,Spline shafts,Slip yokes,Weld yokes,Flange yokes,Steering columns,Connecting rods,etc.
Welcome to visit our factory!
Packing detail:
each product will be packed in individual box with label of all information on it, and boxes will be packed incarton, cartons will be packed in wooden cases. Heavy parts, light parts and fragile parts will be packed separately
Delivery Detail:
30-35 days for sea order based on containers.
Why Choose Speedway?
1.OEM & ODM are welcome.
2.Tried order are avaliable.
3.excellent performance&Promote delivery
4.100% finished product check before shipment
FAQ
Q1.What is your company major products?
A: Our main products are cardan shaft,universal coupling,universal joints and center support bearing.
Q2. What is the MOQ?
A: Usually our MOQ is 5pcs/model for stock items.
Q3. What is the delivery date?
A: It takes 5~7 days if there is stock, but takes 30-45 days if there is no stock.
Q4. What is the packet?
A: Neutral packing or customer made packing.
Q5. What is the payment method?
A: Our payment method:T/T, WEST UNION, PAYPAL.
Q6.How is the quality?
A: Strict control before shipment.
Q7.Can you help to ship the goods?
A: YES. We can help to ship the goods through customer forwarder or our forwarder.
Q8.What are our major market?
A: Our main markets are middle east, Africa, southeast Asia and south America,European..